Risk Matrix Calculator
Calculate risk scores with a colour-coded 3×3, 4×4 or 5×5 risk matrix. Based on ISO 31000.
| L \\ C | C1 | C2 | C3 | C4 | C5 |
|---|---|---|---|---|---|
| L1 | 1 | 2 | 3 | 4 | 5 |
| L2 | 2 | 4 | 6 | 8 | 10 |
| L3 | 3 | 6 | 9 | 12 | 15 |
| L4 | 4 | 8 | 12 | 16 | 20 |
| L5 | 5 | 10 | 15 | 20 | 25 |
What is a Risk Matrix?
A risk matrix is a visual tool used in workplace health and safety (WHS) risk assessment to combine two dimensions of a risk scenario: the likelihood (or probability) that a harmful event will occur, and the consequence (or severity) of harm if it does occur. By multiplying these two indices, the matrix produces a risk score that maps to a risk band — Low, Medium, High, or Extreme — each with corresponding recommended management actions and timeframes.
Risk matrices are used across virtually every industry: construction, mining, healthcare, manufacturing, oil and gas, infrastructure, and corporate environments. They are embedded in AS/NZS ISO 31000:2018 (Risk Management Guidelines), the model WHS Regulations, and thousands of safety management systems worldwide.
5×5 Risk Matrix Descriptors
The 5×5 matrix provides the finest granularity and is most appropriate for formal WHS risk assessments:
- Likelihood: 1 = Rare, 2 = Unlikely, 3 = Possible, 4 = Likely, 5 = Almost Certain
- Consequence: 1 = Insignificant, 2 = Minor, 3 = Moderate, 4 = Major, 5 = Catastrophic
Risk bands for 5×5: Scores 1–3 = Low (Green); 4–6 = Medium (Yellow); 8–12 = High (Orange); 15–25 = Extreme (Red). Note that certain score combinations (e.g., score 7) may straddle bands — the matrix assigns these based on the closest band threshold.
Risk Band Actions and Timeframes
- Low: Manage by routine procedures. No additional treatment required. Periodic monitoring.
- Medium: Designate responsibility and implement additional controls. Review within one month.
- High: Senior management attention required. Implement urgent additional controls. Act within one week.
- Extreme: Stop or suspend the activity if possible. Immediate action required before work proceeds. Notify senior management and regulator if applicable.
How to Use This Calculator
- Select the matrix size (3×3, 4×4, or 5×5) appropriate for your assessment
- Use the dropdown selectors or click directly on the matrix grid to select likelihood and consequence
- Read the risk score, band, colour, and recommended action
- Optionally enable residual risk to compare initial vs post-control risk levels
Residual Risk Assessment
After identifying the initial (inherent) risk level, the next step in the risk management process is to identify and implement controls following the hierarchy: elimination, substitution, engineering controls, administrative controls, then PPE. Once controls are in place, reassess the risk using the residual likelihood and residual consequence to confirm the risk has been reduced to an acceptable level (typically Low or Medium for most tasks).
Limitations of Qualitative Risk Assessment
Qualitative risk matrices provide a structured, rapid assessment tool but have inherent limitations. Research has shown that different assessors often assign very different likelihood and consequence ratings to identical scenarios. Risk scores should not be aggregated across different hazard types (a score of 12 from a minor health hazard does not equal a score of 12 from a catastrophic safety risk). For major hazard facilities, critical infrastructure, and high-consequence environments, quantitative risk assessment (QRA) techniques such as fault tree analysis, bow-tie analysis, and probabilistic risk assessment are required.
الأسئلة الشائعة
- What is a risk matrix?
- A tool for evaluating risk by combining likelihood with consequence severity. Maps to risk bands: Low, Medium, High, Extreme.
- ISO 31000 and risk matrices?
- ISO 31000:2018 is the international risk management standard. The 5x5 matrix is most common in Australian WHS practice.
- 3x3, 4x4, or 5x5?
- 3x3 for quick screening. 4x4 for moderate complexity. 5x5 for formal WHS assessments.
- What is residual risk?
- Remaining risk after applying control measures, compared to initial inherent risk.
- Actions for each risk band?
- Low: routine procedures. Medium: review in 1 month. High: act within 1 week. Extreme: stop work, act immediately.
أدوات ذات صلة
- LTIFR Calculator
Calculate Lost Time Injury Frequency Rate (LTIFR). Enter injuries and hours worked. Supports AU/UK ×1M and OSHA ×200K bases with severity rate.
- TRIFR Calculator
Calculate Total Recordable Injury Frequency Rate (TRIFR). Covers LTI, MTI, RWI and fatalities.
- Daily Noise Exposure Calculator
Calculate daily noise exposure (LEX,8h) and noise dose for multiple tasks. ISO/OSHA modes.
- NIOSH Lifting Equation Calculator
Calculate Recommended Weight Limit (RWL) and Lifting Index using the NIOSH Revised Lifting Equation.
- Fall Clearance Distance Calculator
Calculate total fall clearance distance for shock-absorbing lanyards and self-retracting lifelines.